Skip to content
    4578 Marmora Road, Glasgow
    info@demolink.org
    (719) 445-2808
    Login
    Resiston
    • Typography
    • Maintenance
    • 404
    • Search Results
    • Coming Soon
    • FAQs
    • Documentation
    • Booked Appointment
      Page 18
      You Are Here:
      Home Creative
      /
      Search results for “”
      /
      Page 18

      Search Results for:

      Sustainable Building Design

      The main objectives of sustainable design are to reduce, or completely avoid, depletion of critical resources like energy, water, land, and raw materials; prevent environmental degradation caused by facilities and infrastructure throughout their life cycle; and create built environments that are livable, comfortable …

      Read more

      Sustainable Building Design

      The main objectives of sustainable design are to reduce, or completely avoid, depletion of critical resources like energy, water, land, and raw materials; prevent environmental degradation caused by facilities and infrastructure throughout their life cycle; and create built environments that are livable, comfortable …

      Read more

      Fitting a Square Building

      Like many older U.S. cities, our nation’s capital infrastructure dates back to the early 1800s and their storm and wastewater treatment system is no longer able to accommodate heavy rain events, causing overflows of untreated waste into nearby rivers and streams. Architus’s work was recently featured in Point of Beginning magazine that explains how our use of virtual construction and geospatial technologies are allowing us to place two 160-foot-tall industrial facilities and related equipment underground into tunnel termination shafts to modernize the city’s storm and wastewater infrastructure and effectively reduce overflows.

      Read more

      Fitting a Square Building

      Like many older U.S. cities, our nation’s capital infrastructure dates back to the early 1800s and their storm and wastewater treatment system is no longer able to accommodate heavy rain events, causing overflows of untreated waste into nearby rivers and streams. Architus’s work was recently featured in Point of Beginning magazine that explains how our use of virtual construction and geospatial technologies are allowing us to place two 160-foot-tall industrial facilities and related equipment underground into tunnel termination shafts to modernize the city’s storm and wastewater infrastructure and effectively reduce overflows.

      Read more

      Interventional Radiology Project

      The $2.5 million two-story 4,000-square-foot addition to the existing hospital will provide expanded Interventional Radiology services on the second floor with a new interventional imaging room as well as associated control, patient holding, exam, storage and system electronics spaces. Work also includes the renovation of 700 square feet of existing space and construction of the first floor shell space for future use. With the colder New England temps here, the Architus team is hoping for a mild winter to ensure efficient facilitation of the foundation and structural steel construction. Project completion is anticipated in August 2016.

      Read more

      Interventional Radiology Project

      The $2.5 million two-story 4,000-square-foot addition to the existing hospital will provide expanded Interventional Radiology services on the second floor with a new interventional imaging room as well as associated control, patient holding, exam, storage and system electronics spaces. Work also includes the renovation of 700 square feet of existing space and construction of the first floor shell space for future use. With the colder New England temps here, the Architus team is hoping for a mild winter to ensure efficient facilitation of the foundation and structural steel construction. Project completion is anticipated in August 2016.

      Read more

      Навигация по записям

      PREV 1 … 17 18 19 20 NEXT
      About

      Resiston is a diversified global manufacturing company that brings technology and engineering together to provide innovative solutions to customers in the industrial market.

      Contact Information
      • 4578 Marmora Road, Glasgow
      • info@demolink.org
      • (719) 445-2808
      Please set up MailChimp API key and List ID
      © 2023 Resiston. All Rights Reserved.

      Sign up

      Facebook Google Twitter
      or enter your registration credentials
      Already have an account?Log in
      Sign up

      Sign up

      Facebook Google Twitter
      or enter your registration credentials
      Already have an account?Log in
      Sign up

      Login

      Facebook Google Twitter
      or use your login data
      Don't have an account? Click here toSign up
      Remember me
      Log in

      Login

      Facebook Google Twitter
      or use your login data
      Don't have an account? Click here toSign up
      Remember me
      Log in